-
Per Tullstedt uploaded the file: NorDig-T_draft_minutes_20190402.docx to
NorDigT 6 years, 3 months ago
-
-
Per Tullstedt uploaded the file: 3. NorDig T report to Excom 20190307 early draft003b.pdf to
NorDigT 6 years, 5 months ago
Early draft003b report from NorDig T up to Excom for coming Excom meeting 7th March 2019, includes changes made during NorDig T meeting 26 Feb 2019.
-
Per Tullstedt uploaded the file: NorDig-T_draft_minutes_20190226.docx to
NorDigT 6 years, 5 months ago
-
Per Tullstedt uploaded the file: NorDigTestplan_ver_3.1_task9-10_HDMI_signal_protection_ptu_d002.docx to
Test group 6 years, 6 months ago
Input from Per Tullstedt for HDMI HDCP task 9-10
-
Per Tullstedt uploaded the file: NorDig-T_draft_minutes_20190131.docx to
NorDigT 6 years, 6 months ago
-
Per Tullstedt uploaded the file: Nordig 3.0 new tests Labwise – SI part d001.docx to
Test group 6 years, 6 months ago
Main draft proposal for SI parts, input from Labwise. Use this doc to contine drafting SI parts.
-
Per Tullstedt uploaded the file: Nordig 3.0 new tests Labwise excluding SI parts.docx to
Test group 6 years, 6 months ago
Labwise input proposal for ALL sections except SI (12-13) from approx 1year ago. To be used to compare with new proposals. ActionPoint for all to check with their parts (FronEnd, video, audio, subtitling, HbbTV, PVR etc).
-
Per Tullstedt uploaded the file: NorDigTestplan_ver_3.1_draft006.docx to
Test group 6 years, 7 months ago
Corrections for frontend, added demux and interfaces (inputs fr David W). PLEASE ALL, help check IRD “profiles” (IRD variants and capability)
-
Per Tullstedt uploaded the file: NorDigTestplan_ver_3.1_Interfaces_draft004_20181221.docx to
Test group 6 years, 8 months ago
Updated input/x-mas gift from David Woolgar for the Output Interface test cases. It also contains the Task 9 updates (HDMI ARC, eARC) from Jonas’s Audio draft 007 20181218.
-
Per Tullstedt uploaded the file: NorDigTestplan_ver_3.1_Demux_draft004_20181220.docx to
Test group 6 years, 8 months ago
Updated input/x-mas gift from David Woolgar for the MPEG Demux test cases
-
Per Tullstedt uploaded the file: NorDig-T_draft_minutes_20181211.docx to
NorDigT 6 years, 8 months ago
-
Per Tullstedt uploaded the file: NorDigTestplan_ver_3.1_subtilting_subset_draft004.docx to
Test group 6 years, 8 months ago
Input from Kjell N (and Per T), major update of ALL subtitling requirements, old test cases and proposal for TTML subtilting test cases. Grouping all DVB subtilting basic testing into one test case (v2.6 has part of DVB Subt test made in Prio test task and other part in DVB Subt subset task). A
-
Per Tullstedt uploaded the file: NorDigTestPlan_ver_3.1_Audio_draft006_20181214.docx to
Test group 6 years, 8 months ago
Input from Jonas Rödén:
• (green) cross reference between Task 14 (SI) and appropriate Audio Stream selection task
• (green) Updated the Dialogue Enhancement task to be more inline with future MS12(Playback product for TV’s) testing
• I have cleaned up coloring for E-AC-3 and HE-AAC updated HDMI tasks
• I have kept Task 9 proposed changes in…[Read more] -
Per Tullstedt uploaded the file: NorDigTestplan_ver_3.1_draft003_DW_Tasks 5-9-10–20181213.docx to
Test group 6 years, 8 months ago
Input from David Woolgar: Small updates to Tasks 5-3 and 5-10 in attached document.
-
Per Tullstedt uploaded the file: NorDigTestplan_ver_3.1_draft004-JuhaJokiHbbTV_JanMueller_b.docx to
Test group 6 years, 8 months ago
Input from Juha Joki: Editorial updates for HbbTV (tasks 9:9, 9:11, 16:xx), some checks for correct references (chapters, table numbers, etc) to Nordig 3.1 spec. All changes highlighted in yellow.
Additional input from Jan Mueller (Dolby): proposed changes on the HbbTV general section. -
Per Tullstedt deleted the file: NorDigTestplan_ver_3.1_draft004-JuhaJokiHbbTV.docx from
Test group 6 years, 8 months ago
-
Per Tullstedt uploaded the file: NorDigTestplan_ver_3.1_subtilting_subset_draft002.docx to
Test group 6 years, 8 months ago
Input from Kjell Norberg
-
Per Tullstedt uploaded the file: NorDigTestplan_ver_3.1_video_subset_ptu_draft002.docx to
Test group 6 years, 8 months ago
Per Tullstedt 2nd proposal video tests d002, updated several test cases, video test cases 2-4 still remains.
-
Per Tullstedt uploaded the file: NorDigTestplan_ver_3.1_RF_draft005_Silicon_Labs_FM_06Dec18.docx to
Test group 6 years, 8 months ago
Franck Mantel input/update: I just found a typo in test procedure of task 1:9 (-40dBm input level instead of -60dBm). This typo has been corrected in draft005.
- Load More
NorDigT meeting – September 4
NorDigT Group meeting, 4th. September 2025, 10:00 – 12:00 CET, Webinar