Public Group
active 8 months, 2 weeks agoNorDigT Drafting subgroup
Chair: Peter Mølsted
mail: peter@moelstedconsulting.dk
Group mail: drafting_group@nordig.email
Documents List
-
TV Accessibility - NorDig Guidelines and recommendations_ draft003.docx (159.3 KB)
-
NorDig Drafting Group minutes of meeting 25_11_07_draft.docx (80.7 KB)
-
NorDig Drafting Group minutes of meeting 25_10_31_final.docx (79.8 KB)
-
NorDig Drafting Group minutes of meeting 25_10_06_final.docx (80.2 KB)
-
NorDig Unified Requirements ver. 3.2.2_draft005.docx (1.9 MB)
Including updated Annex H - diagram: “Loudness levels – Typical IDTV Audio Block diagram”, updated to latest version diagram from DTG D-Book ver. 12.11.
-
NorDig Drafting Group minutes of meeting 25_09_29_final.docx (80.2 KB)
-
NorDig Unified Requirements ver. 3.2.2_draft004.docx (1.9 MB)
NorDig Unified Requirements ver. 3.2.2_draft004
Remaining item, Annex H and reference list, proposal to update the audio block diagram (which is a liaison-copy from DTG D-book) to DTG new improved latest version and update reference to DTG D-book from v7 to v12.11.
IRD specification draft004 included in specification package of v3.2.2 for comments and acceptance as “final draft” at NorDig T at NorDig T meeting 1 Oct 2025 -
NorDig Rules of Operation ver. 3.2.2_draft002.docx (1.8 MB)
NorDig Rules of Operation ver. 3.2.2_draft002
12.9 to be moved to annex to be in line with IRD spec (late proposal in IRD spec)
RoO specification draft002 included in specification package of v3.2.2 for comments and acceptance as “final draft” at NorDig T at NorDig T meeting 1 Oct 2025 -
NorDig Unified Testplan ver.3.2.2_draft003.docx (4.4 MB)
Test Plan draft003 included in specification package of v3.2.2 for comments and acceptance as “final draft” at NorDig T at NorDig T meeting 1 Oct 2025.
-
NorDig Drafting Group minutes of meeting 25_09_17_final.docx (81.2 KB)
-
NorDig Drafting Group minutes of meeting 25_09_02_final.docx (81 KB)
-
NorDig Unified Requirements ver. 3.2.2_draft004.docx (1.9 MB)
-
NorDig Rules of Operation ver. 3.2.2_draft002.docx (1.8 MB)
-
NorDig Unified Testplan ver.3.2.2_draft002.docx (4.4 MB)
-
NorDig Unified Testplan ver.3.2.2_draft001.docx (4.5 MB)
-
NorDig Accessibility Group minutes of meeting 25_08_27_final.docx (102.8 KB)
-
NorDig Rules of Operation ver. 3.2.2_draft001.docx (1.8 MB)
-
NorDig Unified Requirements ver. 3.2.2_draft002.docx (1.8 MB)
-
NorDig Drafting Group minutes of meeting 25_06_13_final.docx (80.4 KB)
-
Test Plan with references updated to match Unified Requirements 3.2.2 Draft (626 KB)
The references have been updated to match 1756764072-NorDigUnifiedRequirementsver.3.2.2_draft001
Minor changes to language to help understanding, no editorial changes.