Public Group
active 1 year, 4 months agoNorDigT SSU subgroup
Chair: Per Tullstedt
mail: per.tullstedt@teracom.se
mail: per.tullstedt@teracom.se
Documents List
-
Draft_NorDig-Unified_Test_Plan_ver_3.1_self_declaration_SSU_OTN_USB_draft009.docx (204.2 KB)
Stable draft of SSU Self declaration (via using TestPlan v2.6 addendum for SSU or TestPlan v3.1)
-
Draft_NorDig-Unified_Test_Plan_ver_v3.1_subset_SSU_Intro_OTA_OTN_draft015.docx (576.8 KB)
Final draft from SSU subgroup, where group propose to make it is an Addendum to TestPlan v2.6 (until Test Plan v3.1 is published)
-
NorDig-Unified_Test_Plan_ver_v3.0_subset_SSU_v008_OTN_USBself_declaration_ALT2 (451.3 KB)
AlT2 based on draft 1537891067-1537342445-Draft_NorDig-Unified_Test_Plan_ver_v3.0_subset_SSU_Intro_OTA_OTN_draft014 from Per
-
NorDig-Unified_Test_Plan_ver_v3.0_subset_SSU_v008_OTN_USBself_declaration_ALT1 (421.2 KB)
ALT1 with no test cases included
-
1537342445-Draft_NorDig-Unified_Test_Plan_ver_v3.0_subset_SSU_Intro_OTA_OTN_draft014 (693.7 KB)
Updated according to the telco 18th September 2018.
I propose to keep 11:6 as is , it complements the other tasks. Maybe for the next testplan make a rethink of task 11:6 -
NorDig SSU telco meeting minutes 20180918.docx (191.8 KB)
-
NorDig-Unified_Test_Plan_ver_v3.0_subset_SSU_v007_OTN_USBself_declaration.docx (420.3 KB)
-
Draft_NorDig-Unified_Test_Plan_ver_v3.0_subset_SSU_Intro_OTA_OTN_draft013.docx (685.6 KB)
-
NorDig-Unified_Test_Plan_ver_v3.0_subset_SSU_v006_KaEr_OTN_USB self_declaration (253.4 KB)
1st page declaration text edited, added Brand, Model, Platform and sw version fields. Updated system example picture at page 2.
-
Draft_NorDig-Unified_Test_Plan_ver_v3.0_subset_SSU_Intro_OTA_OTN_draft012 (726 KB)
There are no material changes to the document compared with draft v011, bu the ‘shall’ s are highlighted in bold red to match the IRD spec and for easier reviewing.
-
NorDig-Unified_Test_Plan_ver_v3.0_subset_SSU_v005_KaEr_OTN_USB self_declaration (241.6 KB)
Draft 005 test cases matching with Draft_NorDig-Unified_Test_Plan_ver_v3.0_subset_SSU_Intro_OTA_OTN_draft012
-
Draft_NorDig-Unified_Test_Plan_ver_v3.0_subset_SSU_Intro_OTA_OTN_draft012 (729.9 KB)
There are no material changes to the document compared with draft v011, bu the 'shall' s are highlighted in bold red to match the IRD spec and for easier reviewing.
-
Draft_NorDig-Unified_Test_Plan_ver_v3.0_subset_SSU_Intro_OTA_OTN_draft010.docx (597 KB)
Updates during the SSU group meeting 14th June 2018
-
1528466393-Draft_NorDig-Unified_Test_Plan_ver_v3.0_subset_SSU_Intro_OTA_OTN_draft009_Samsung.docx (569.3 KB)
Added some cross references
-
Draft_NorDig-Unified_Test_Plan_ver_v3.0_subset_SSU_Intro_OTA_OTN_draft008_Samsung.docx (379.3 KB)
Input from Richard M (Samsung) now including updated text for USB SSU
-
NorDig SSU telco meeting minutes 20180605.docx (194.2 KB)
-
Draft_NorDig-Unified_Test_Plan_ver_v3.0_subset_SSU_OTA_OTN_USB_draft007.docx (294.2 KB)
-
1527583582-Draft_NorDig-Unified_Test_Plan_ver_v3.0_subset_SSU_Intro_OTA_draft006_Per_L (279.4 KB)
Not including the USB test case
-
NorDig SSU telco meeting minutes 20180529.docx (193.1 KB)
-
Draft_NorDig-Unified_Test_Plan_ver_v3.0_subset_SSU_v003_DavidW.docx (188.1 KB)
During meeting updated version of OTN SSU test case, draft003