Public Group
active 5 months agoNorDigT Verification Test subgroup
Chair: Pasi Toiva
mail: pasi.toiva@labwise.fi
Group mail: test_group@nordig.email
Documents List
-
NorDigTestplan_ver_3.1_draft004.docx (3.8m)
-
NorDigTestplan_ver_3.1_video_subset_ptu_draft002.docx (1.4m)
Per Tullstedt 2nd proposal video tests d002, updated several test cases, video test cases 2-4 still remains.
-
NorDigTestplan_ver_3.1_RF_draft005_Silicon_Labs_FM_06Dec18.docx (3.7m)
Franck Mantel input/update: I just found a typo in test procedure of task 1:9 (-40dBm input level instead of -60dBm). This typo has been corrected in draft005.
-
NorDig Test Group minutes of meeting 30_11_18_draft.docx (71.1k)
-
NorDig Test Group minutes of meeting 23_11_18_final.docx (72.1k)
-
NorDigTestPlan_ver_3.1_Audio_draft004_Merged_JG_JR_Task7_14_17_20181130.docx (171.4k)
From Jonas Rödén (dolby) and Jacobo Giralt (Dolby): Audio draft004 for
- Test task 7 (audio) NGA part + HDMI ARC/eARC for AC-3,
- Test task 14 (navigator) audio parts
- Test task 17 (pref setting) audio parts -
NorDigTestplan_ver_3.1_RF_draft004_Silicon_Labs_FM_30Nov18.docx (3.7m)
From Franck Mantel: this FrontEnd draft004 vs draft003:
- adds yellow highlight to modified/new text proposals
- new proposal for Task 3:22.
and as earlier draft004/003 vs draft002 changes are:
- IRD profile DVB-S2X added (part I chapter 6 and part II chapters 1 and satellite test cases)
- DVB-S2X figures added in tasks 1:4, 1:9, 1:11 and 1:14
- Some typos corrected (Task 1:9 Requirement and IRD Profile(s), Task 1:14 where alpha is different from roll-off as detailed in test procedure. Note that only roll-off value specified for DVB-S is 0.35)
- To minimize increase of test duration compared to 2.6 satellite test plan, 8PSK tests with pilots off were removed from Task1:14 (8PSK tests with pilots on remain) to add DVB-S2X 16APSK and 32APSK tests with pilots on. -
NorDigTestplan_ver_3.1_video_subset_ptu_draft001.docx (1.3m)
Input from Per Tullstedt, the very first and unmature draft 001 for the video chapter/tasks. Main updated the requirement text parts.
-
NorDigTestplan_ver_3.1_RF_draft003_Silicon_Labs_FM_29Nov18.docx (3.7m)
From Franck Mantel: Based on NorDig Unified 3.1 satellite requirements, this draft003 was John’s draft002 updated with:
- IRD profile DVB-S2X added (part I chapter 6 and part II chapters 1 and satellite test cases)
- DVB-S2X figures added in tasks 1:4, 1:9, 1:11 and 1:14
- Some typos corrected (Task 1:9 Requirement and IRD Profile(s), Task 1:14 where alpha is different from roll-off as detailed in test procedure. Note that only roll-off value specified for DVB-S is 0.35)
- To minimize increase of test duration compared to 2.6 satellite test plan, 8PSK tests with pilots off were removed from Task1:14 (8PSK tests with pilots on remain) to add DVB-S2X 16APSK and 32APSK tests with pilots on. -
NorDigTestplan_ver_3.1_draft003_DW_Tasks 5-9-10--20181122.docx (3.7m)
-
NorDig_TestPlan_only_AC4_test_cases_20181122.docx (138.5k)
-
NorDig Test Group minutes of meeting 2018.11.23_draft.docx (71.5k)
-
NorDigTestplan_ver_3.1_draft003.docx (3.7m)
-
NorDig Test Group minutes of meeting 15_11_18_draft.docx (68.6k)
-
NorDig Test Group minutes of meeting 01_11_18_final.docx (67.3k)
-
NorDigTestplan_ver_3.1_RF_draft002_Sony_JNW_29Oct18.docx (3.7m)
TestPlan Draft002 RF (satellite + terrestrial) subset from John Wilson, Sony, after input from Franck Mantel, SiLabs, dated 30th Oct 2018.
-
Nordig Test Plan 3.1 Draft 003 JJ HbbTV (3.6m)
Nordig Test Plan 3.1 proposal (HBBTV changes)
-
NorDig Test Group minutes of meeting 2018.10.18_draft.docx (67.2k)
-
NorDigTestplan_ver_3.1_draft002.docx (3.6m)
-
NorDig Test Group minutes of meeting 25_09_18_final.docx (65.4k)