Public Group
active 5 months agoNorDigT Verification Test subgroup
Chair: Pasi Toiva
mail: pasi.toiva@labwise.fi
Group mail: test_group@nordig.email
Documents List
-
NorDigTestplan_ver_3.1_SIdraft012.docx (850.7k)
-
NorDigTestplan_ver_3.1_SIdraft011.docx (857.8k)
-
NorDigTestplan_ver_3.1_SIdraft008-1.docx (796.7k)
Proposal from Juha J (Sofia Digital)
-
NorDigTestplan_ver_3.1_Common main draft011_jonas5.docx (4.5m)
Prposal from Jacobo G and Jonas R (Dolby)
-
AnnexA Network custodians version 2.docx (15.5k)
From Kari Eriksson
-
NorDigTestplan_ver_3.1_draft005_Task 12_Performance_(31.01.2019).docx (5m)
-
NorDigTestplan_ver_3.1_draft006_SiLabs_2019_Feb_1.docx (4.2m)
-
NorDigTestplan_ver_3.1_task9-10_HDMI_signal_protection_ptu_d002.docx (160.3k)
Input from Per Tullstedt for HDMI HDCP task 9-10
-
NorDigTestplan_ver_3.1_draft006-task7.docx (4.2m)
Draft audio task 7 from Jacobo
-
NorDigTestplan_ver_3.1_draft005_PR.docx (5m)
Performance draft from Patryk
-
NorDigTestplan_ver_3.1_Interfaces_draft004_20181221.docx (226.3k)
Updated input/x-mas gift from David Woolgar for the Output Interface test cases. It also contains the Task 9 updates (HDMI ARC, eARC) from Jonas’s Audio draft 007 20181218.
-
NorDigTestplan_ver_3.1_Demux_draft004_20181220.docx (177.2k)
Updated input/x-mas gift from David Woolgar for the MPEG Demux test cases
-
NorDigTestplan_ver_3.1_subtilting_subset_draft004.docx (514.3k)
Input from Kjell N (and Per T), major update of ALL subtitling requirements, old test cases and proposal for TTML subtilting test cases. Grouping all DVB subtilting basic testing into one test case (v2.6 has part of DVB Subt test made in Prio test task and other part in DVB Subt subset task). A
-
NorDigTestPlan_ver_3.1_Audio_draft006_20181214.docx (245.3k)
Input from Jonas Rödén:
• (green) cross reference between Task 14 (SI) and appropriate Audio Stream selection task
• (green) Updated the Dialogue Enhancement task to be more inline with future MS12(Playback product for TV’s) testing
• I have cleaned up coloring for E-AC-3 and HE-AAC updated HDMI tasks
• I have kept Task 9 proposed changes in green, since no feedback yet. -
NorDigTestplan_ver_3.1_draft003_DW_Tasks 5-9-10--20181213.docx (3.7m)
Input from David Woolgar: Small updates to Tasks 5-3 and 5-10 in attached document.
-
NorDigTestplan_ver_3.1_draft004-JuhaJokiHbbTV_JanMueller_b.docx (3.7m)
Input from Juha Joki: Editorial updates for HbbTV (tasks 9:9, 9:11, 16:xx), some checks for correct references (chapters, table numbers, etc) to Nordig 3.1 spec. All changes highlighted in yellow.
Additional input from Jan Mueller (Dolby): proposed changes on the HbbTV general section. -
NorDigTestplan_ver_3.1_subtilting_subset_draft002.docx (367.6k)
Input from Kjell Norberg
-
NorDigTestplan_ver_3.1_RF_draft006_Sony_JW_11Dec18.docx (3.7m)
-
NorDigTestplan_ver_3.1_video_subset_ptu_draft002.docx (1.4m)
Per Tullstedt 2nd proposal video tests d002, updated several test cases, video test cases 2-4 still remains.
-
NorDigTestplan_ver_3.1_RF_draft005_Silicon_Labs_FM_06Dec18.docx (3.7m)
Franck Mantel input/update: I just found a typo in test procedure of task 1:9 (-40dBm input level instead of -60dBm). This typo has been corrected in draft005.