show less
show more
Public Group
active 4 months, 1 week agoNorDig Technical Committee
Chair: Per Tullstedt
mail: per.tullstedt@teracom.se
Group mail: nordigt_group@nordig.email
Documents List
-
DRAFT NorDig-T_minutes_2021.12.08v002.docx (111.6 KB)
corrected minutes (wrong date in header and Enext NorDig xcom meeting is 17th March 2022).
-
DRAFT NorDig-T_minutes_2021.12.08.docx (110.6 KB)
-
Survey_NorDig Broadcasters formats and standards_draft 002b.docx (72.5 KB)
-
DRAFT NorDig-T_minutes_2021.11.03.docx (107 KB)
-
TTML NorDig Broadcasters_Summary_25_10_2021.docx (66.1 KB)
-
3. NorDig T report back from Excom 2021.10.14.pdf (803 KB)
-
TTML NorDig Broadcasters_Summary_12_10_2021.pdf (148.5 KB)
-
3. NorDig T report to Excom 2021.10.14d002.pdf (682 KB)
-
DRAFT NorDig-T_minutes_2021.09.29.docx (454.3 KB)
-
NorDig Rules of Operation ver. 3.1.3_draft001.docx (2.2 MB)
first common draft of NorDig RoO v3.1.3
-
5G frokostseminar NRK.pdf (6.6 MB)
-
DRAFT NorDig-T_minutes_2021.09.01.docx (360.2 KB)
-
NorDig Rules of Operation ver. 3.1.3_draft001.docx (2.2 MB)
-
DRAFT NorDig-T_minutes_2021.05.26.docx (108.3 KB)
-
DRAFT NorDig-T_minutes_2021.03.31.docx (154.2 KB)
-
DRAFT NorDig-T_minutes_2021.03.03v002.docx (152 KB)
corrected minutes for 3rd March 2021 meeting
-
3. NorDig T report back from Excom 2021.03.11.pdf (639.2 KB)
-
3. NorDig T report to Excom 2021.03.11d003.pdf (805.6 KB)
-
NorDig Unified Requirements ver. 3.1.2_draft003.docx (1.8 MB)
Draft proposal sent to NorDig Excom for decision/approval (for NorDig Excom meeting 11th march 2021)
-
NorDig Rules of Operation ver. 3.1.2_draft002.docx (2.2 MB)
Draft proposal sent to NorDig Excom for decision/approval (for NorDig Excom meeting 11th march 2021)