show less
show more
Public Group
active 3 months, 2 weeks agoNorDig Technical Committee
Chair: Per Tullstedt
mail: per.tullstedt@teracom.se
Group mail: nordigt_group@nordig.email
Documents List
-
NorDigTestplan_ver_3.1_Common main draft015c.docx (4.7m)
During the Test group meeting 19th June updates (interrim copy - stable draft)
-
NorDig Unified Requirements ver. 3.1_draft_APD_updates_input_20190617-II.docx (1.8m)
Inputs from NorDig Audio group
- NorDig_Unified_IRD_ v 3.1.1 draft001.docx (1.8m)
- NorDig Unified_IRD_v 3.1.1 LogicalChannelDescriptor draft002.docx (196.3k)
- NorDig-T_draft_minutes_20190514.docx (109.6k)
- 3. NorDig T report back from Excom 20190307 draft006.pptx (2m)
- NorDig-T_draft_minutes_20190402.docx (101.3k)
-
3. NorDig T report to Excom 20190307 early draft003b.pdf (2.9m)
Early draft003b report from NorDig T up to Excom for coming Excom meeting 7th March 2019, includes changes made during NorDig T meeting 26 Feb 2019.
- NorDig-T_draft_minutes_20190226.docx (101.5k)
- NorDig-T_draft_minutes_20190131.docx (97.5k)
- NorDig-T_draft_minutes_20181211.docx (98.3k)
- NorDig-T_draft_minutes_20181108.docx (98.5k)
- NorDig T report back from Excom 20181004 draft004.pdf (869.8k)
- NorDig-T_draft_minutes_20180920.docx (139.6k)
- NorDig Unified_IRD_v 3.1 draft002.docx (1.8m)
-
NorDig Unified_IRD_v 3.1 draft001.docx (1.7m)
First draft NorDig IRD spec v3.1, still missing NGA and HbbTV v2.0.2. NGA is still drafted in separate document.
- NorDig-T_draft_minutes_20180829.docx (134k)
- NorDig-T_draft_minutes_20180619.docx (100.2k)
-
NorDig-T_extra_meeting_UHD_HEVC_security_draft_minutes_20180612.docx (74.2k)
Minutes from extra meeting related extra/enhanced security for UHD / HEVC content
-
Guidelines and recommendation drafting NorDig specifications v_1_0.pdf (200.2k)
NorDig first guideline for drafting and proposing updates